
Introduction
It provides a stable operation carrier for offshore oil and gas development and various marine engineering activities, replaces traditional temporary offshore operation facilities, ensures the safety, continuity and efficiency of offshore operations, and is the core equipment in the marine oil and gas industry and marine engineering field.
Core Features & Advantages
(1) Solid Structure, Outstanding Disaster Resistance:
-Adopting high-strength weathering steel integral welding structure, the main frame is tested by ultrasonic flaw detection, and the structural strength meets international offshore equipment standards. It can resist typhoons above level 12 and huge waves above 6 meters, and adapt to extreme temperature environments from -20℃ to 60℃. The bottom adopts pile leg fixing or floating positioning design, with extremely strong stability.
-The platform swing amplitude is controlled within 5° during operation, ensuring the accuracy of precision operations such as drilling and extraction. The surface is treated with double-layer anti-corrosion (sandblasting derusting + fluorocarbon coating), which effectively resists marine salt spray corrosion and extends the service life of the platform to more than 20 years.


(2)Convenient Operation and Maintenance, Controllable Operation Costs:
-Adopting modular design, each functional module can be independently disassembled, inspected, maintained and replaced without overall shutdown, greatly reducing the operation and maintenance downtime and improving the operation continuity. The core equipment is selected from international mature brands, with stable quality, failure rate less than 1.5%, simple later maintenance and low maintenance cost.
-Equipped with a remote operation and maintenance monitoring system, it can realize remote monitoring of equipment operation status, fault diagnosis and remote guidance, reducing the input of offshore operation and maintenance personnel. The platform adopts energy-saving design, using energy-saving equipment and energy recovery system, which reduces energy consumption by more than 20% compared with traditional offshore platforms, and can significantly save energy costs in long-term operation.
Q&A
Q: How long does the construction and disassembly cycle take?
A: The construction cycle depends on the platform specifications, about 15-30 days for small platforms and 45-60 days for large platforms; the disassembly cycle is 1/2 of the construction cycle, and the modular design can greatly shorten the construction and disassembly time and reduce the operation interruption cost.

-
Quality Control
Implement ISO system, monitor production throughout the process, and ensure that equipment meets standards.
-
Professional Testing
Advanced equipment testing, strict performance testing, to ensure stable operation.
-
After-sales Service
24-hour response, one-year warranty.
-
Continuous Improvement
Collect customer feedback, optimize product performance, and enhance use value.
Hot Tags: floating offshore wind platform, China floating offshore wind platform factory


